Operating Precautions for Rock Drill Operators

Pneumatic rock drills for coal mine drilling

1. Operate pneumatic rock drills workers,Before going down the well must wear good personal labor protection equipment.
2. Arriving at the workplace, first check the processing, knocking on the roof, pry out the pumice, check the sled personnel to do their own safety protection, to be supervised by someone lighting, from the outside to the inside, from top to bottom, determine no danger before starting work.
3. Check whether there is residual medicine or blind cannon on the working face, if there is to be handled correctly, it is strictly forbidden to hit the residual eye or blind cannon.
4. Check the wind and water pipeline and rock drilling equipment, and make sure that everything is intact before starting rock drilling.
5. Rock drilling must be operated by two persons, one for main operation and one for auxiliary operation and safety supervision.
6.When rock drilling in the upper mountain or shaft, a solid workbench must be set up before operation to ensure safety before work is allowed.
7. There must be sufficient lighting on the working surface.
8. It is forbidden to wear gloves when operating the rock drill, and the cuffs should be tied.
9. It is strictly forbidden to hit the residual eye and prevent the braze from slipping into the residual eye.
10. It is strictly forbidden to hit dry eyes, water before wind when starting the machine, wind before water when stopping the machine, and rock drillers have the right to refuse to work if there is not enough water for rock drilling.
11. Do not ride on the air leg or lean on the machine to hit the eye. In order to prevent injury from broken brazier, and to prevent the brazier from falling down and hitting the foot when chiseling upwards.
12. When the rock drill is operating normally, no one is allowed to stand in front or below.
13. When moving the air leg, the air door must be closed and the machine must be stopped to prevent injury.
14. High-pressure air duct joints should be tied firmly to prevent the air duct joints from disconnecting and injuring people.
15. After rock drilling, close the wind and water pipe.


Post time: Apr-04-2023